HomeIndustriesEnergyRenewable energyComposite machiningDrilling in fibreglassCase story drilling
Energy
Energy

ENERGY

CASE STORY

Good cooperation has more than one winner. We see our
customers as partners, and we believe that efficient and
profitable production is the best basis for long-term success for our customers.
Our main job is to improve your competitiveness and together with you we analyse and optimise your key processes via tool investments as well as the introduction of new products.
Below is an example on how we helped one of our customers exceed their goal.

Contact us
A succes story

A SUCCESS STORY

Learn how we helped one of our customers reduce their production time by almost half by re-thinking their tool design completely, saving them a lot of time and money.

The problem

THE PROBLEM

The market leading wind turbine manufacturer was struggling with the time consuming and costly task of drilling holes in fibreglass wings.

The drilling process for each hole was far too long and the surface quality was unacceptable.

The solution

THE SOLUTION

Our expert team analysed the problem and the current processes. Within a short period of time, and in close cooperation with the manufacturer, we came up with the design of three new special tools.

The cooperation is still an ongoing process where we continuously improve and optimise the tools together with the surrounding processes.

The result

THE RESULT

The result was a much faster solution with a smoother hole surface, which made the next steps in the manufacturing process up to 50% faster than before.

This is now a proven and running solution at the customer’s global manufacturing sites.

Asiakaspalvelu

Etsi yhteystietosi

Ota yhteyttä meihin

© 2022 KYOCERA UNIMERCO A/S, ALL RIGHTS RESERVED
TYÖKALUTPuuMetalliRuokateollisuus